Our projects
STATOR PRESSING TO CALIBRATION RING AND STATOR HOUSING
THE PURPOSE OF THE SYSTEM IS FORMING SEMI-AUTOMATIC STATOR FORMING AND PRESSING INTO THE CALIBRATION RING. AFTER PRESSING STATOR IN CALIBRATION RING, THE HOUSING AND THE STATOR ARE POSITIONATED SEMI-AUTOMATICALLY, AND THE STATOR IS PREPARED TO BE PRESSED INTO THE HOUSING. STATOR HOUSING IS HEATED UP TO 100ºC AND THE TEMPERATURE IS CONTROLLED DURING THE PROCESS.




